Seaton South Embankment Upgrade
Network Rail
The project involved regrading approximately 280 metres of the embankment to enhance structural stability and improve rail safety.
Network Rail
The project involved regrading approximately 280 metres of the embankment to enhance structural stability and improve rail safety.
RWE Renewables
Works were carried out to demolish an existing storage building, and replace it with a larger, modern structure.
Network Rail
VolkerRail/Story joint venture were tasked with the £80m project as part of a £137m investment that saw the undertaking of extensive enhancement works to remove several bottlenecks along the route to improve reliability, increase passenger services and aid in freight movements.
SSE Renewables
SSE Renewables received planning consent to install an additional 15 turbines, which would generate up to 84MW.
Ethical Power Connections
The site was a greenfield location where a new 33kV metering substation was installed to facilitate this connection.
Ethical Power Connections
Story was responsible for the civil and structural elements of the Broxburn BESS Project, operating as a subcontractor under Ethical Power.
SPT
Story Contracting Ltd were engaged by Ansaldo STS (Hitachi) as their principal contractor to support the comprehensive upgrade of the Glasgow Subway network for SPT (Strathclyde Partnership for Transport).