SPT Broomloan Depot
SPT
Story Contracting Ltd were engaged by Ansaldo STS (Hitachi) as their principal contractor to support the comprehensive upgrade of the Glasgow Subway network for SPT (Strathclyde Partnership for Transport).
Find out more about our capabilities and expertise on a range of civil engineering solutions for national and regional clients.
SPT
Story Contracting Ltd were engaged by Ansaldo STS (Hitachi) as their principal contractor to support the comprehensive upgrade of the Glasgow Subway network for SPT (Strathclyde Partnership for Transport).
Network Rail
Story Contracting replaced a key bridge linking Pollokshields and Kinning Park, maintaining pedestrian access via a temporary footbridge while managing complex utility diversions, major excavations, and two disruptive possessions.
Ayrshire Roads Alliance
Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.
Network Rail Route Services
Story Contracting delivered new inspection pits inside Holgate Depot, as part of a series of enhancement to the Network Rail facility in order to expand operations.
Network Rail
Upon inspection it was identified that the structure was suffering from defects such as loose brickwork, open joints, parapet leaning/bulging, fractured pattress plates and other minor works areas typical of masonry.
EKFB
This complex and high-profile scheme was led by Story Contracting’s in-house project management and engineering teams.
BAE Systems
Story Contracting were contracted by BAE Systems to carry out the project which was a mixture of civils and building works to prepare the site for the new University of Cumbria facility.
Defence Infrastructure Organisation (DIO)
Story Contracting were contracted by Landmarc to carry out the project to construct a new 1214m2 industrial style training building for the Defence Infrastructure Organisation (DIO) within the Catterick MOD base.
Holmen Iggesund
In 2021 Story were appointed to assist the design team to produce the most efficient construction sequence to carry out the construction of a new Effluent Treatment Plant at the Iggesund factory in Workington, Cumbria.