Bicester Underbridges
Network Rail
Working alongside Network Rail on a project to deliver two brand new underbridge structures in Bicester for Oxfordshire County Council.
Network Rail
Working alongside Network Rail on a project to deliver two brand new underbridge structures in Bicester for Oxfordshire County Council.
Lakes College
Story carried out works to complete the construction of Lakes College’s purpose-built civil engineering training centre at their campus in Lillyhall, Workington.
Network Rail
Story Scotland were commissioned by Network Rail to renew the timer waybeam structure at Challoch Clumps entirely.
Network Rail
The bridge at Bombo Burn required extensive remediation in the form of scour protection works, as well as vegetation management and masonry repair works.
Network Rail
Story Contracting were commissioned by Network Rail to install a 137m length contiguous piled wall to stabilise the embankment supporting the Hull to Selby railway line.
Network Rail
This challenging scheme has involved the application of a spray applied concrete system to the natural rock culvert, which sits 8 metres below the railway lines as water flows through Garpol Glen and into the Evan water.
London Metric Property PLC
Story carried out works to install flood protection measures to protect the two stores from any future flooding after both properties experienced significant flooding in 2005 and 2015.
Network Rail
Works to design and build a new railway station in Horden on behalf of Network Rail and Durham County Council.