Pirelli Curing Line Extension

Pirelli Curing Line Extension

Pirelli UK

View project

Story were engaged by long-term client, Pirelli UK, in a single source tender process for the design and build of a new extension at their factory in Carlisle, which would house elements of their curing process.

View project
Civic Centre Flood Repairs
Building

Civic Centre Flood Repairs

Carlisle City Council

Building
View project

The ground floor of the building was badly impacted by the floods caused by Storm Desmond in December 2015 and had been unused for six years as a result. Extensive refurbishment works were required to repurpose the ground floor which previously housed a large amount of the council’s public-facing operations.

View project
RAF Spadeadam
Building

RAF Spadeadam

DNV

Building
View project

Story Contracting were contracted by DNV to carry out the project to construct a new office extension and workshop area at the RAF Spadeadam site in Cumbria.

View project
Barrow Active Travel Cycle Scheme
Infrastructure

Barrow Active Travel Cycle Scheme

Cumbria County Council

Infrastructure
View project

Part of wider planned improvements throughout the town, Story Contracting were contracted by Cumbria County Council to complete the active travel scheme in Barrow-in-Furness.

View project
East Stand Refurbishment works
Building

East Stand Refurbishment works

Carlisle United Football Club

Building
View project

Works were carried out to refurbish and fit out internal areas of the East Stand at Carlisle United’s Brunton Park stadium, which had been largely unused since the 1990s.

View project
A595 Torpenhow Junction Improvements
Infrastructure

A595 Torpenhow Junction Improvements

Cumberland Council

Infrastructure
View project

Works were carried on the A595 Torpenhow/Bothel Junction in order to reduce travel times, improve reliability and protect and enhance the natural environment.

View project
Smardale Gill Viaduct Masonry Repairs
Infrastructure

Smardale Gill Viaduct Masonry Repairs

Northern Viaduct Trust

Infrastructure
View project

Following the successful re-waterproofing of the Grade II listed structure in 2023, Story were contracted to carry out masonry repairs to the arches and piers of the viaduct.

View project
Cameron Bridge

Cameron Bridge

Network Rail

View project

Topographical survey works were carried out on the Levenmouth Reconnect Project to inform ground levels prior to our designers providing a temporary works crane pad design.

View project
Double Dykes

Double Dykes

Network Rail

View project

Works were carried out on the Levenmouth Reconnect Project to inform design and the development of rewilding plans.

View project