Burton Underpass
Ayrshire Roads Alliance
Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.
2.9 km
of cycle lanes installed in town centre
First project designed to
LTN 1/20
in Cumbria
The project involved the following main phases:
Throughout all stages of the project, the Story team conducted regular discussions with the client, ensuring that all client needs were discovered and attended to. This proactive approach to managing the project through both the design and delivery stages also enabled any changes to the work scope to be dealt with quickly and efficiently to negate any impact on the project programme.
Throughout the project the site team were required to engage closely with a range of local stakeholders. The project took place within Barrow town centre and therefore required effective traffic management to minimise any disruption to the local community. This also included cooperation with BAE Systems to ensure any alterations and traffic management did not impact upon the transportation of nuclear submarine parts and sections. The team also engaged with the local cycling club from an early stage to ensure the design of the scheme would be suitable for use when complete.
Ayrshire Roads Alliance
Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.
"*" indicates required fields