Barrow Active Travel Cycle Scheme

Part of wider planned improvements throughout the town, Story Contracting were contracted by Cumbria County Council to complete the active travel scheme in Barrow-in-Furness.

2.9 km
of cycle lanes installed in town centre

First project designed to
LTN 1/20
in Cumbria

The Scope

The project involved the following main phases:

• Site set up works
• Excavation of surfacing, kerbs and footpaths
• Development, set up and management of traffic management plan
• Surfacing works
• Installation of HB2, radius and beany kerbs
• Drainage installation
• Repositioning of lighting columns
• Construction of new bus stop base and relocation of 3no bus stops
• Installation of tactiles and raised iron work
• Installation of ductwork, draw pits, nal sockets and loop boxes
• Removal and reinstatement of white lines plus additional road markings
• Installation of improved road crossings
• Erection of new signage and poles throughout scheme
• Installation of Rediweld Orcas and Wands throughout length of the scheme

Delivering Success

Throughout all stages of the project the Story team conducted regular discussions with the client, ensuring that all client needs were discovered and attended to. This proactive approach to managing the project through both the design and delivery stages also enabled any changes to the work scope to be dealt with quickly and efficiently to negate any impact on the project programme.

The Story Way

Throughout the project the site team were required engage closely with a range of local stakeholders. The project took place within Barrow town centre and therefore required effective traffic management to minimise any disruption to the local community. This also included cooperation with BAE Systems to ensure any alterations and traffic management did not impact upon the transportation of nuclear submarine parts and sections. The team also engaged with the local cycling club from an early stage to ensure the design of the scheme would be suitable for use when complete.

Related projects

View all
Burton Underpass
Infrastructure

Burton Underpass

Ayrshire Roads Alliance

Infrastructure
View project

Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.

View project
Royal Border Bridge
Infrastructure

Royal Border Bridge

Network Rail

Infrastructure
View project

Upon inspection it was identified that the structure was suffering from defects such as loose brickwork, open joints, parapet leaning/bulging, fractured pattress plates and other minor works areas typical of masonry.

View project
HS2 GUN28
Infrastructure

HS2 GUN28

EKFB

Infrastructure
View project

This complex and high-profile scheme was led by Story Contracting’s in-house project management and engineering teams.

View project

To find out how we can help deliver your future project then get in touch

"*" indicates required fields