Auch Viaduct Refurbishment
Network Rail
Refurbishment works were delivered to Auch Viaduct on the West Highland Line over a 40-week period, often in difficult weather conditions.
Network Rail
Refurbishment works were delivered to Auch Viaduct on the West Highland Line over a 40-week period, often in difficult weather conditions.
James Walker & Co
Story carried out works to install flood protection measures which would protect James Walker & Co’s facility in Cockermouth from a ‘one in 1000’ flood event.
Network Rail
Story Contracting were tasked to deliver three critical elements of the Edinburgh Waverley Capacity Upgrade plan, to extend and improve the platforms at Scotland’s second busiest railway station.
Network Rail
On behalf of Network Rail, Story Scotland transformed the North Ayrshire station with a three-span footbridge with lifts and stairs giving step-free access to all platforms. The scheme marked the sixth Access For All project completed by Story Scotland for Network Rail.
Network Rail
Over a 12 month period works were carried out to replace the existing Georgian wired glazing system in the station concourse and all station canopies with 10,000 new TwinFix polycarbonate glazing panels.
Network Rail
Replacement of the existing 2 span wrought iron footbridge with a new single span aluminium footbridge in London.
Pladis Global
Following flooding in December 2015, Story designed and installed flood alleviation measures at the McVities factory in Carlisle.
Network Rail
Over a 12 month period works were carried out to replace Muirhead Road Overbridge as part of Network Rail’s ‘Railway Upgrade Plan’.