Gill Viaduct

Drones were utilised to provide support the project ecology team to identify potential bat roosting locations.

THE PROJECT

Story Drones provided support to our in-house ecologists that were completing a preliminary Ecological Appraisal prior to masonry repair works commencing. The viaduct required a thorough inspection to identify any potential bat roosting locations within cracks and crevices of the structure. Traditionally inspection would be undertaken by rope access operatives and can often mean works would need to be undertaken nightshift with the operatives accessing from the track above and roping down the structure checking thoroughly. Multiple set ups would be required and inspecting the structure would take a great deal of time and cause increased disturbance to any roosting bats.

Story drones were able to complete a very detailed inspection of the structure from below with using the Mavic 3 Enterprise thermal drone and its digital zoom, search lights mounted on the drone allowed for illumination of any likely roosting locations with the crevices / voids. All of works were completed safely during the day meaning no requirement for nightshift working and possession of the railway line, data collection was less than 3hrs, there was no requirement for roped access operatives.

4k Video / photographs were issued to the ecologists for inclusion in their final reports, on this occasion the structure was confirmed as having no roosting bats and therefore no constraints for the repair works.

Related projects

View all
Seaton South Embankment Upgrade
Rail

Seaton South Embankment Upgrade

Network Rail

Rail
View project

The project involved regrading approximately 280 metres of the embankment to enhance structural stability and improve rail safety.

View project
RWE Wind Farm
Energy

RWE Wind Farm

RWE Renewables

Energy
View project

Works were carried out to demolish an existing storage building, and replace it with a larger, modern structure.

View project
Hope Valley Railway Upgrade
Infrastructure

Hope Valley Railway Upgrade

Network Rail

Infrastructure
View project

VolkerRail/Story joint venture were tasked with the £80m project as part of a £137m investment that saw the undertaking of extensive enhancement works to remove several bottlenecks along the route to improve reliability, increase passenger services and aid in freight movements.

View project

To find out how we can help deliver your future project then get in touch