• Site set up works
• Excavation of surfacing, kerbs and footpaths
• Development, set up and management of traffic management plan
• Surfacing works
• Installation of HB2, radius and beany kerbs
• Drainage installation
• Repositioning of lighting columns
• Construction of new bus stop base and relocation of 3no bus stops
• Installation of tactiles and raised iron work
• Installation of ductwork, draw pits, nal sockets and loop boxes
• Removal and reinstatement of white lines plus additional road markings
• Installation of improved road crossings
• Erection of new signage and poles throughout scheme
• Installation of Rediweld Orcas and Wands throughout length of the scheme