Auch Viaduct Refurbishment

Refurbishment works were delivered to Auch Viaduct on the West Highland Line over a 40-week period, often in difficult weather conditions.

600m2 
waterproofing installed

400t
scaffolding surrounding the structure

9-day
blockade

The Scope

The scope of the project is to design and implement the following works:

• Installation of longitudinal EKKI deck and OPEPE ballast boards and waterproofing designed to accommodate full LM71 railway live loading in accordance with Eurocodes.
• Undertake metalwork strengthening to achieve the specified live load capacities of RA8 at 20mph and RA5 at 30mph.
• Apply new M24 paint system blast cleaned to surface standard Sa2½ satisfy a 25-year service life in a C4 High environment.
• Condition-led metalwork and concrete substructure repairs designed to maintain the structure capacity at the aforementioned RA ratings.
• Replacement of existing access ladders to underside inspection walkways at both ends of the structure.
• Devegetation of structure and area within 5m envelope.

The Story Way

In order to put passengers first, the works were planned to ensure that the West Highland Line could remain open throughout the project. During the 9 day blockade, which saw the line closed between Crianlarich and Fort William, the Auch Viaduct team worked day and night in extreme weather conditions to lift the track to replace and waterproof the timber deck underneath.

As part of the agreement with the Auch Estate owners, Story also re-surfaced the access road from the A82 down to the West Highland Way walking route. No accidents or incidents were reported during the 40-week project.

Related projects

View all
Hope Valley Railway Upgrade
Infrastructure

Hope Valley Railway Upgrade

Network Rail

Infrastructure
View project

VolkerRail/Story joint venture were tasked with the £80m project as part of a £137m investment that saw the undertaking of extensive enhancement works to remove several bottlenecks along the route to improve reliability, increase passenger services and aid in freight movements.

View project
Burton Underpass
Infrastructure

Burton Underpass

Ayrshire Roads Alliance

Infrastructure
View project

Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.

View project
Royal Border Bridge
Infrastructure

Royal Border Bridge

Network Rail

Infrastructure
View project

Upon inspection it was identified that the structure was suffering from defects such as loose brickwork, open joints, parapet leaning/bulging, fractured pattress plates and other minor works areas typical of masonry.

View project

To find out how we can help deliver your future project then get in touch