A595 Torpenhow Junction Improvements

Works were carried on the A595 Torpenhow/Bothel Junction in order to reduce travel times, improve reliability and protect and enhance the natural environment.

6,300m2
of surfacing complete

22,000m3
of material excavated

The Scope

The project involved the following main activities:

  • Significant muck shift works
  • Rerouting of the existing Torpenhow road
  • Installation of pre-cast concrete units and wingwalls to extend the existing under-road culvert in order to accommodate the widening of the A595
  • Realignment of Bothel Beck to enable road widening
  • Instatement of turning lanes into Bothel and the new Torpenhow junction
  • Construction of a new lined SuDS attenuation pond
  • Completion of significant drainage improvement works
  • Surfacing works throughout the length of the project on the existing A595 and the newly constructed Torpenhow road
  • Construction of new footpaths
  • Extensive fencing and landscaping works throughout the full area of the project
  • Traffic management throughout the project on a key transport route with high levels of traffic.

 

Delivering Success

Throughout the delivery of the project the Story team worked in close collaboration with a variety of key stakeholders including Connect Highways and the local environmental authority to ensure the successful completion of the works. As the improvement works impacted a major commuter route in Cumbria, works and traffic management were planned so as to minimise disruption to local residents wherever possible.

The Story team provided a significant saving to the client through providing an alternative solution for statutory diversions. This resulted in the team moving existing services, rather than the planned disconnection and reinstatement of services, which would have resulted in service outages and increased costs.

The Story Way

Throughout the project the Story team worked with multiple key stakeholders to ensure works were planned and complete successfully, with minimal disruption. This included the client, local landowners, the local parish council and member of the local community, including businesses.

In order to keep interested parties up to date with the works, community drop in sessions were held at Bothel Community Centre, with frequent letter drops sent out and community notice boards erected at either side of the scheme.

Alongside the client, social media updates were also utilised to update the local community on key milestones and any potential disruption, with these posts also utilised to promote local businesses such as The Greyhound Inn.

I am delighted that the Torpenhow road junction is now open, as the A595 is very important for connectivity between Carlisle and West Cumbria. I would like to thank Story Contracting for all their hard work, and the CLEP for their funding investment – this road will help to make people’s lives not only safer, but a little bit easier on a daily basis.

Denise Rollo - Executive Member for Sustainable, Resilient and Connected Places Cumberland Council

Related projects

View all
Hope Valley Railway Upgrade
Infrastructure

Hope Valley Railway Upgrade

Network Rail

Infrastructure
View project

VolkerRail/Story joint venture were tasked with the £80m project as part of a £137m investment that saw the undertaking of extensive enhancement works to remove several bottlenecks along the route to improve reliability, increase passenger services and aid in freight movements.

View project
Burton Underpass
Infrastructure

Burton Underpass

Ayrshire Roads Alliance

Infrastructure
View project

Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.

View project
Royal Border Bridge
Infrastructure

Royal Border Bridge

Network Rail

Infrastructure
View project

Upon inspection it was identified that the structure was suffering from defects such as loose brickwork, open joints, parapet leaning/bulging, fractured pattress plates and other minor works areas typical of masonry.

View project

To find out how we can help deliver your future project then get in touch