Cathkin BESS

The site was a greenfield location where a new 33kV metering substation was installed to facilitate this connection.

17,000t
of granular material placed

768m3
of concrete poured

The Scope

The scope of the project was to implement the following works:

• Comprehensive earthworks to prepare the site were undertaken.
• Construction of site access roads.
• Implementation of security measures and lighting systems.
• Installation of precast battery container & BIC foundations.
• Construction of additional foundations around thee MV skid perimeter.
• Installation of effective substation drainage works and underground ducting routes.

Value Engineering

The team were able to re-use timber formwork panels from the Broxburn BESS project and utilised the same supply chain.

The Story Way

The Cathkin BESS team hosted a Construction Aware Industry Taster Day, as part of Story’s commitment to inspiring future generations. The ten pupils involved were all interested in careers in construction and thoroughly enjoyed learning about the various roles open to them. The group took part in a live site visit with our Graduate Engineer, interactive STEM session as well as a bridge building competition where the winners were judged on design, cost and teamwork.

Related projects

View all
RWE Wind Farm
Energy

RWE Wind Farm

RWE Renewables

Energy
View project

Works were carried out to demolish an existing storage building, and replace it with a larger, modern structure.

View project
Bhlaraidh Wind Farm
Energy

Bhlaraidh Wind Farm

SSE Renewables

Energy
View project

SSE Renewables received planning consent to install an additional 15 turbines, which would generate up to 84MW.

View project
Broxburn BESS
Energy

Broxburn BESS

Ethical Power Connections

Energy
View project

Story was responsible for the civil and structural elements of the Broxburn BESS Project, operating as a subcontractor under Ethical Power.

View project

To find out how we can help deliver your future project then get in touch