Carlisle Southern Gateway

The Scope

The project involved the following main activities:

  • Trial pits and GPR surveys in advance of works to ensure avoidance of uncharted services
  • Breaking out of existing footpaths and roads
  • Creation of new highway, cycleway and footpath alignments
  • Installation of new kerbing
  • Surfacing to new highways and cycleways
  • Installation of new surface water drainage
  • Installation of rain gardens and attenuation tanks
  • Installation of new Lazonby Sandstone and granite paving throughout the scheme
  • Traffic management measures across multiple high-traffic junctions
  • Addition of new cycleways and cycle-specific traffic signals
  • Extensive landscaping throughout scheme
  • Removal of existing traffic signals and replacement with new signals
  • Refurbishment and replacement of existing bus stands
  • Installation of new police CCTV system
  • Installation of Lawson’s Monument and well cover to enable public display
  • Installation of new street lighting throughout

Delivering Success

The team safely delivered complex works in a live city centre, managing high-density buried services while implementing a full road closure to maximise quality and safety for both the workforce and public. The team value-engineered locally sourced materials, mitigated costly statutory diversions, and aligned programmes with the Station Gateway scheme to deliver measurable time and cost efficiencies while reducing disruption.

Rapid redesign following the discovery of a historic well ensured its preservation and future public display, demonstrating adaptability and care, while maintaining progress, protecting programme milestones, and ensuring budget certainty throughout.

The Story Way

The team delivered  targeted engagement, including regular face-to-face briefings with city centre businesses throughout the full road closure to ensure disruption was minimised and concerns addressed in real time.

Social value was embedded throughout the scheme, with school engagement sessions, site taster days with local Pupil Referral Units, and hands-on experience opportunities to inspire future careers. Extensive volunteering and donations were also delivered, including the redevelopment of a community garden for Botcherby Community Centre, with skills, labour, and materials contributed by Story’s extended supply chain, creating a lasting, positive legacy.

Related projects

View all
Burton Underpass
Highways

Burton Underpass

Ayrshire Roads Alliance

Highways
View project

Essential works took place to replace the unsafe road crossing over Dunure Road by reopening a former railway tunnel as a new underpass.

View project
Royal Border Bridge
Highways

Royal Border Bridge

Network Rail

Highways
View project

Upon inspection it was identified that the structure was suffering from defects such as loose brickwork, open joints, parapet leaning/bulging, fractured pattress plates and other minor works areas typical of masonry.

View project
HS2 GUN28
Highways

HS2 GUN28

EKFB

Highways
View project

This complex and high-profile scheme was led by Story Contracting’s in-house project management and engineering teams.

View project

To find out how we can help deliver your future project then get in touch

"*" indicates required fields