Story carried out works to complete the construction of Lakes College’s purpose-built civil engineering training centre at their campus in Lillyhall, Workington.

5,000t
of spoil moved during cut and fill

ZERO
accidents and incidents

The Scope

  • Strip land to formation level
  • Install foundations
  • Extensive drainage works to site
  • SuDS and swale formed to accommodate the volume of ground water to allow settlement and discharge into the beck
  • Construction of single-storey teaching block, consisting of blockwork and concrete floors
  • Construction of 15m x 35m steel portal frame building
  • Cladding works to buildings
  • Concrete walls with tin effect to be replicated to one side to match overclad of portal frame
  • New culverts for access and footpath crossings developed and agreed with Environmental Agency
  • Construction and surfacing of site car parking
  • Lighting and fencing installation
  • Painting of steel portal frame to protect from sea water corrosion

The Story Way

Throughout the project we engaged with Lakes College and students from local schools to provide work experience opportunities as part of our commitment to inspiring the next generation of talent in the industry. This included our bespoke virtual work experience programme which enabled students to gain valuable experience despite the challenges of the COVID pandemic.

This work experience programme also included 14 students attending a socially-distanced site visit at Lakes College, with further students also attending site later on in the project.

Delivering Success

The project team worked in close collaboration with the architect and structural designers to resolve ongoing issues which arose throughout duration of the project. Maintaining this collaborative relationship enabled us to quickly implement practical solutions to keep the works moving and without impacting the final project outcome.

Our team also worked through numerous methodologies for the site’s new culverts, enabling approval to be quickly received from the Environment Agency.

Related projects

View all
BAE Systems Enabling Works
Building

BAE Systems Enabling Works

BAE Systems

Building
View project

Story Contracting were contracted by BAE Systems to carry out the project which was a mixture of civils and building works to prepare the site for the new University of Cumbria facility.

View project
Catterick Urban Fighting Skills
Building

Catterick Urban Fighting Skills

Defence Infrastructure Organisation (DIO)

Building
View project

Story Contracting were contracted by Landmarc to carry out the project to construct a new 1214m2 industrial style training building for the Defence Infrastructure Organisation (DIO) within the Catterick MOD base.

View project
Iggesund Effluent Treatment Plant
Building

Iggesund Effluent Treatment Plant

Holmen Iggesund

Building
View project

In 2021 Story were appointed to assist the design team to produce the most efficient construction sequence to carry out the construction of a new Effluent Treatment Plant at the Iggesund factory in Workington, Cumbria.

View project

To find out how we can help deliver your future project then get in touch